Analysis of Standard Times and Operator Requirements for the Sewing of IS 1200-900 Type FIBCs Using Time Study and Workload Analysis
DOI:
https://doi.org/10.59976/jurit.v4i3.459Keywords:
Flexible Intermediate Bulk Container (FIBC), Stopwatch Time Study, Workload Analysis, Standard Time, Operator Staffing Requirements.Abstract
This study was conducted on the sewing process of IS 1200-900 type Flexible Intermediate Bulk Containers (FIBCs) on Line 8 at PT X. During observations in July–August 2026, six operators produced 85 units per shift out of a target of 86 units. This study aims to determine standard times and standard rates, assess line capacity and each operator’s workload, calculate the minimum number of operators required, and propose a task allocation plan. The processing time for 12 elements was measured with a stopwatch 30 times per element. Standard time was calculated with a 15% allowance and used in the Workload Analysis (WLA) to compare scenarios with six, seven, and eight operators. Normal time and standard time were 29.25 and 34.41 minutes per unit, respectively. The theoretical capacity for six operators is 86.15 units per shift based on standard time and 73.23 units per shift based on standard time. Actual production closely matches the estimate based on standard time. In this scenario, the target requires 99.83% of working time before the allowance is factored in. At the production target, the total workload reached 49.33 operator-hours per shift, while the available time was only 42 hours. The line’s WLA reached 117.45%, with individual workloads ranging from 53.8% to 180.0%. Four operators were estimated to be overloaded. The seven-operator scenario still yields a line WLA of 100.67%, making eight operators the minimum requirement based on standard time, with an estimated line WLA of 88.08%. The proposed workload balancing divides the work volume among elements A6, A7, and A12 so that each operator’s workload aligns with the available working time. In practice, the research results provide a basis for PT X to determine the number of operators per shift and to develop a task allocation plan before testing the design under actual production conditions.
References
M. Kim and S. Kim, “Effects of step-by-step line balancing in apparel assembly line,” J. Eng. Fiber. Fabr., vol. 18, pp. 1–10, 2023, doi: 10.1177/15589250231191196.
M. Erol, “Assembly line balancing: a case study for increasing and optimizing productivity in the clothing sector,” Sādhanā, vol. 50, p. 188, 2025, doi: 10.1007/s12046-025-02856-1.
B. Koç and S. H. Eryürük, “Optimizing sewing line balancing in apparel manufacturing through digitalization,” Fibres Text. East. Eur., vol. 33, no. 1, pp. 10–26, 2025, doi: 10.2478/ftee-2025-0002.
M. F. Santoso, A. E. Apsari, N. Oktyajati, and S. Purwati, “Penentuan waktu baku pada produksi sabuk jumbo bag menggunakan metode time study pada PT. Sami Surya Perkasa,” 2022. [Online]. Available: https://repository.uniba.ac.id/1149/
S. A. Setiawan and Y. P. Utamana, “Penentuan output standart produksi yang optimal untuk produk jumbo bag tipe FIBC MCCI PTGA di PT. Wiharta Karya Agung Gresik,” Universitas Internasional Semen Indonesia, 2021. [Online]. Available: https://repository.uisi.ac.id/4848/
S. Auladi, P. Azzahra, and T. Juniarto, “Optimalisasi kebutuhan tenaga kerja produksi dengan metode stopwatch time study,” J. Tek. Ibnu Sina, vol. 11, no. 1, pp. 1–12, 2026, doi: 10.36352/jt-ibsi.v11i01.1458.
Y. Fernanda, J. Hutabarat, and K. Kiswandono, “Analisa beban kerja dengan pendekatan Workload Analysis (WLA) untuk menentukan jumlah tenaga kerja yang optimal pada industri dupa,” J. Valtech, vol. 6, no. 2, pp. 252–257, 2023, doi: 10.36040/valtech.v6i2.7407.
Z. F. Rosyada and K. T. Zafi, “Optimalisasi proses produksi di lini sewing produk TM6535S24 menggunakan metode Workload Analysis dan Line Balancing dengan simulasi ExtendSim,” Ind. Eng. Online J., vol. 1, no. 3, 2026, [Online]. Available: https://ejournal3.undip.ac.id/index.php/ieoj/article/view/58922
F. K. Wardhani and Y. Primasanti, “Analisis beban kerja operator jahit dalam satu line dan pemerataan beban kerja dengan metode line balancing: Studi kasus PT. PB,” Mars J. Tek. Mesin, Ind. Elektro dan Ilmu Komput., vol. 4, no. 2, pp. 14–24, 2026, doi: 10.61132/mars.v4i2.1528.
M. M. Teshome, T. Y. Meles, and C.-L. Yang, “Productivity improvement through assembly line balancing by using simulation modeling in case of Abay garment industry Gondar,” Heliyon, vol. 10, no. 1, p. e23585, 2024, doi: 10.1016/j.heliyon.2023.e23585.
R. A. Joy, M. S. Hawlader, M. S. Rahman, M. R. Hossain, S. I. Shamim, and H. Mahmud, “Improving quality, productivity, and cost aspects of a sewing line of apparel industry using TQM approach,” Math. Probl. Eng., vol. 2024, p. 6697213, 2024, doi: 10.1155/2024/6697213.
F. N. A. Fairuz and H. F. Satoto, “Workload analysis to determine labor requirements using the Workload Analysis (WLA) method,” J. Rekayasa Sist. dan Ind., vol. 13, no. 1, pp. 55–64, 2026, doi: 10.25124/jrsi.v13i01.11033.
B. Bizuneh and B. Kidanemariam, “Prevalence of musculoskeletal disorders among industrial sewing machine operators and their associated factors,” Int. J. Occup. Saf. Ergon., vol. 32, no. 1, pp. 98–112, 2026, doi: 10.1080/10803548.2025.2506229.
Y. A. Nurdiansyah and H. F. Satoto, “Optimasi waktu standar kerja menggunakan metode stopwatch time study,” JURMATIS J. Manaj. Teknol. dan Tek. Ind., vol. 5, no. 1, pp. 59–68, 2023, doi: 10.30737/jurmatis.v5i1.2913.
M. R. Aldiansyah and Kusnadi, “Analisis beban kerja dan jumlah pekerja menggunakan metode Workload Analysis (studi kasus PT. Metal Stamping),” J. Tek., vol. 21, no. 1, pp. 68–76, 2023, doi: 10.37031/jt.v21i1.293.
R. Syarifuddin, E. J. Hayat, and D. S. Tjaptjani, “Estimasi kebutuhan tenaga kerja langsung menggunakan Workload Analysis untuk optimalisasi beban produksi,” J. Kalibr., vol. 23, no. 2, pp. 430–442, 2025, doi: 10.33364/kalibrasi/v.23-2.3128.
R. Wahyudi, A. T. Nugraha, and A. S. Kinasih, “Penentuan waktu baku dengan stopwatch time study untuk pengukuran kerja operator di PT XYZ Lampung Tengah,” J. Sains dan Apl. Keilmuan Tek. Ind., vol. 3, no. 2, pp. 79–88, 2023, doi: 10.33479/jtiumc.v3i2.76.
V. A. Putra and H. F. Satoto, “Analisa beban kerja dan studi waktu kerja guna optimalisasi proses produksi: Studi kasus CV. XYZ,” J. Surya Tek., vol. 12, no. 1, pp. 169–175, 2025, doi: 10.37859/jst.v12i1.9344.
R. Maulana, S. K. Ratoko, and Suhaeri, “Penerapan metode time study pada Workload Analysis (WLA) untuk mengetahui beban kerja dalam menentukan jumlah tenaga kerja optimal di PT XYZ,” Indones. J. Innov. Sci. Knowl., vol. 3, no. 3, pp. 716–735, 2026, doi: 10.31004/ijisk.v3i3.277.
F. W. Al-Muqaffa, R. Yohanes, and N. Winarsih, “Analisis beban kerja dengan metode Work Load Analysis pada departemen produksi di PT. X,” Ind. J. Ilm. Tek. Ind., vol. 9, no. 1, pp. 69–80, 2025, doi: 10.37090/indstrk.v9i1.1558.
M. A. Ara, N. Anjum, D. Ahbab, M. T. Sidiika, and R. R. Chowdhury, “Productivity improvement of garments industry by implementing line balancing algorithms—A case study,” Eng. Reports, vol. 7, no. 4, p. e70125, 2025, doi: 10.1002/eng2.70125.
S. S. Hailemariam, “Scheduling problems in the apparel industries: a systematic literature review,” Res. J. Text. Appar., pp. 1–20, 2026, doi: 10.1108/RJTA-09-2025-0213.
S. Kirin, A. Hursa Šajatović, and S. Firšt Rogale, “Use of MTM, RAV and ZAK methods in determining working methods and time norms in technological operations of sewing clothes,” Processes, vol. 12, no. 4, p. 740, 2024, doi: 10.3390/pr12040740.
Sumardiyono, Y. A. Putri, and W. Y. Rha, “Impact of work-fit stretching on occupational fatigue among industrial sewing operators,” Indones. J. Occup. Saf. Heal., vol. 14, no. 3, pp. 293–304, 2025, doi: 10.20473/ijosh.v14i3.2025.293-304.
A. E. Abate and S. S. Hailemariam, “Improving work-related musculoskeletal disorders for sewing machine operators in Ethiopia,” Int. J. Occup. Saf. Ergon., vol. 29, no. 2, pp. 573–585, 2023, doi: 10.1080/10803548.2022.2058747.
F. Parvin, M. Rafiquzzaman, M. S. Parvez, and A. Aziz, “Ergonomic compatibility between sewing workstation and Bangladeshi apparel workers,” Int. J. Occup. Saf. Ergon., vol. 30, no. 4, pp. 1234–1249, 2024, doi: 10.1080/10803548.2024.2385786.
R. K. Seidu, E. A. Ofori, B. Eghan, G. K. Fobiri, A. O. Afriyie, and R. Acquaye, “A systematic review of work-related health problems of factory workers in the textile and fashion industry,” J. Occup. Health, vol. 66, no. 1, p. uiae007, 2024, doi: 10.1093/joccuh/uiae007.
A. Ayough and B. Khorshidvand, “Robust optimization for the integrated worker-cell assignment and sequencing problem in a lean U-shaped assembly line,” Comput. Ind. Eng., vol. 178, p. 109139, 2023, doi: 10.1016/j.cie.2023.109139.
N. Katiraee, M. Calzavara, S. Finco, O. Battaïa, and D. Battini, “Assembly line balancing and worker assignment considering workers’ expertise and perceived physical effort,” Int. J. Prod. Res., vol. 61, no. 20, pp. 6939–6959, 2023, doi: 10.1080/00207543.2022.2140219.
G. Y. Kim, J. Yun, C. Lee, J. Lim, Y. Kim, and S. D. Noh, “Data-driven analysis and human-centric assignment for manual assembly production lines,” Comput. Ind. Eng., vol. 188, p. 109896, 2024, doi: 10.1016/j.cie.2024.109896.
L. Tiacci, “Assigning rest times to workers in assembly lines with ergonomically hazardous tasks: an approach to defend companies’ profitability,” Int. J. Prod. Res., vol. 62, no. 4, pp. 1239–1261, 2024, doi: 10.1080/00207543.2023.2180304.
P. Albulescu, I. Macsinga, A. Rusu, C. Sulea, A. Bodnaru, and B. T. Tulbure, “‘Give me a break!’ A systematic review and meta-analysis on the efficacy of micro-breaks for increasing well-being and performance,” PLoS One, vol. 17, no. 8, p. e0272460, 2022, doi: 10.1371/journal.pone.0272460.
B. Bizuneh and R. Mamecha, “Evaluation of an industrial sewing workstation design and its impact on perceived productivity,” J. Eng., vol. 2025, p. 7388434, 2025, doi: 10.1155/je/7388434.
M.-A. Abdous, X. Delorme, D. Battini, and F. Sgarbossa, “Scenario-based optimization and simulation framework for human-centered assembly line balancing,” Int. J. Prod. Econ., vol. 282, p. 109513, 2025, doi: 10.1016/j.ijpe.2024.109513.
H. Yang, J. H. Lee, S. H. Lee, S. G. Lee, H. R. Kim, and H. J. Kim, “A multi-manned assembly line worker assignment and balancing problem with positional constraints,” IEEE Robot. Autom. Lett., vol. 7, no. 3, pp. 7786–7793, 2022, doi: 10.1109/LRA.2022.3185784.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Nabiilah Nur Khoiriyyah, Moh. Jufriyanto

This work is licensed under a Creative Commons Attribution 4.0 International License.
This work is licensed under a Creative Commons Attribution 4.0 International License (CC BY 4.0).