https://jurnaljepip.com/index.php/jurit/issue/feedJurnal Riset Ilmu Teknik2026-10-31T20:23:40+07:00Dr. Suleman Batubaraadmin@jurnaljurit.comOpen Journal Systems<div class="deskripsi"> <table style="height: 306px;" width="662"> <tbody> <tr> <td width="100px"><strong>Journal Title</strong></td> <td width="77%">: Jurnal Riset Ilmu Teknik</td> </tr> <tr> <td width="23%"><strong>Initials</strong></td> <td width="77%">: JURIT</td> </tr> <tr> <td width="23%"><strong>Frequency</strong></td> <td width="77%">: 3 issues per year </td> </tr> <tr> <td width="23%"><strong>E-ISSN</strong></td> <td width="77%">: <a href="https://issn.perpusnas.go.id/terbit/detail/20230601131235955">2987-7253</a></td> </tr> <tr> <td width="23%"><strong>P-ISSN</strong></td> <td width="77%">: <a href="https://issn.perpusnas.go.id/terbit/detail/20230601221520949">2987-7261</a></td> </tr> <tr> <td width="23%"><strong>DOI</strong> <strong>Prefix</strong></td> <td width="77%">: https://doi.org/10.59976/jurit</td> </tr> <tr> <td width="23%"><strong>Publisher</strong></td> <td width="77%">: Lembaga Penelitian dan Ilmu Pengetahuan Jepip</td> </tr> <tr> <td width="23%"><strong>Index</strong></td> <td width="77%">: <a href="https://sinta.kemdiktisaintek.go.id/journals/profile/18594">Sinta 3</a></td> </tr> </tbody> </table> </div> <p style="text-align: left;"><img style="margin-left: 8px; margin-right: 15px; box-shadow: 5px 5px 5px gray; float: left;" src="https://jurnaljepip.com/public/site/images/admin1/cover-jurit-kcl.png" alt="" width="172" height="243" /></p> <p style="text-align: justify;"><strong>Jurnal Riset Ilmu Teknik (JURIT)</strong> is a peer-reviewed journal that publishes scientific articles from <strong>various engineering disciplines</strong>. Journal JURIT which is published by Lembaga Penelitian dan Ilmu Pengetahuan Jepip.</p> <p style="text-align: justify;">All manuscripts sent to the Jurnal Riset Ilmu Teknik editor are accepted and Published in <strong>English</strong>. Open Journal Systems (OJS) has been applied for all business processes in Jurnal Riset Ilmu Teknik. Therefore, authors are required to register in advance and upload the manuscript online. The manuscript's progress could be monitored through OJS. Authors, readers, editorial board, editors, and peer reviewers could obtain the real-time status of the manuscript. Effective issue: Volume 3, Number 3, 2025 <span style="font-size: 0.875rem;">Download the new template: </span><a style="background-color: #ffffff; font-size: 0.875rem;" href="https://docs.google.com/document/d/1HFzMOMo4ByCx2S-I5GAVSgjS4ee8XWTp/edit">Tamplate download link</a></p> <p style="text-align: justify;"><a href="https://sinta.kemdiktisaintek.go.id/journals/profile/18594"><img src="https://jurnal.unimed.ac.id/2012/public/site/images/jurnalsekolah/9cadf960-0d45-41dd-8ae1-bf4069f057b4-bc26fa4a3a43df65b1b3fec5c34445fa.png" width="465" height="239" /></a><br /><br /></p> <p><a href="https://jurnaljepip.com/index.php/jurit/citednees_scopus"><img src="https://ejournal.uin-suska.ac.id/public/site/images/mustakim_ijaidm/Scopus_IJAIDM.jpg" /></a></p>https://jurnaljepip.com/index.php/jurit/article/view/402Feasibility of Crowd-Aware AR Indoor Navigation Using YOLOv82026-10-01T11:22:09+07:00Evianita Dewi Fajriantievianita08@pens.ac.idAmma Liesvarastranta Hazliesvarastranta@pens.ac.idAris Kurniawanariskur@it.student.pens.ac.idAndharu Raffiandharuraffi@it.student.pens.ac.idHadi Muhammad Hafiiz Hilmihafiizhilmi@it.student.pens.ac.idSaniyatul Mawaddahsaniyatul@pens.ac.idNirwana Haidar Harinhh@pens.ac.id<p><em>Augmented reality (AR) indoor navigation provides visual guidance, while crowd-responsive route selection requires current crowd information to be connected to route planning. This study evaluates the integration of camera-based crowd monitoring with AR route adaptation and measures its response time on local infrastructure.</em> <em>The proposed system uses YOLOv8s to detect people, classifies crowd levels from person counts, and uses Unity NavMesh to compute alternative routes displayed through AR on a smartphone.</em> <em>The integration extends static routing by using crowd levels estimated from camera feeds to temporarily exclude highly crowded passages from route planning and update the displayed AR route when an alternative path is available. </em><em>E</em><em>valuation covered detection, crowd-level classification, rerouting, response time, and a static–dynamic routing comparison. Detection mAP@0.5 was 91.92%, and crowd-level classification accuracy was </em><em>90.67% across 75 observations</em><em>. Rerouting succeeded in all 30 controlled events, with an average response time of 2.772 s from the first classification of a zone as highly crowded to the display of the updated AR route. The suitability of this response time for hospital navigation requires further evaluation. In 30 paired trials, dynamic routing avoided the designated crowded zones but increased mean path length and navigation time in all three zones. Testing was limited to one hospital floor with three monitored zones. User comfort, accessibility, and performance in larger buildings require further evaluation.</em></p>2026-10-31T00:00:00+07:00Copyright (c) 2026 Evianita Dewi Fajrianti, Amma Liesvarastranta Haz, Aris Kurniawan, Andharu Raffi, Hadi Muhammad Hafiiz Hilmi, Saniyatul Mawaddah, Nirwana Haidar Harihttps://jurnaljepip.com/index.php/jurit/article/view/395Value Engineering Based on Ecological-Visual Dual Function in Toll Road Landscape Planning: Empirical Evidence of Life Cycle Cost Efficiency of the Dumai–Rantauprapat Section2026-09-02T21:29:34+07:00Nasrul Fananifanani.nasrul@gmail.comSuryawan Murtiadisuryawan@istn.ac.idDwi Dinarianadwidinariana@yahoo.com<p data-pm-slice="1 1 []">This study evaluates landscape planning for Package 1 of the Dumai–Rantauprapat Toll Road (STA 0+000–27+000), comprising 15 plant species with an initial budget of IDR 8,261,901,154. Plant selection must balance ecological functions, including soil protection, visual quality, and long-term costs. The objectives are to identify major cost contributors, establish plant-selection priorities, and estimate potential life-cycle savings. Using a case study and ex-ante evaluation, the study combines Value Engineering, Pareto analysis, the Value Index, and Analytic Hierarchy Process (AHP) assessments by three experts. Life Cycle Cost Analysis (LCCA) covers 40 years at an 8% discount rate. Data were drawn from cost budget documents and modeled plant-replacement scenarios. Pareto analysis shows that Dew Grass accounts for 63.38% of the landscape budget, while three principal aesthetic plants represent 87.60% of costs within the aesthetic group. AHP assigns the highest priority to ecological function (29.46%), followed by visual function (20.26%), with a combined consistency ratio of 0.0376. A proposed combination of Bahia Grass, Yellow Fire, Akalipa, and Alamanda yields an estimated life-cycle cost of IDR 56,816,365,772, compared with IDR 59,608,395,120 for the original design. The modeled difference is IDR 2,792,029,348, equivalent to potential savings of 4.68%. These savings are projections rather than realized financial outcomes, and the ecological and visual performance of replacement species remains unverified in the field. The study offers an integrated framework for prioritizing landscape expenditure, comparing plant alternatives, and planning maintenance over the operational lifespan of toll roads. Future field assessments should validate plant survival, maintenance needs, and aesthetic performance.</p>2026-11-03T00:00:00+07:00Copyright (c) 2026 Nasrul Fanani, Suryawan Murtiadi, Dwi Dinarianahttps://jurnaljepip.com/index.php/jurit/article/view/394Risk-Based Prioritization of School Safety Zone Interventions Based on Accident Risk and Safety Facility Conditions in Banjar City2026-09-02T21:33:17+07:00Veronica Simanjuntakveronia@ptdisttd.ac.idSiti Khodijah Kotositi.khadijah@ptdisttd.ac.idDian Virda Sejatidian.virda@ptdisttd.ac.idMega Suryandarisuryandarimega@gmail.com<p data-pm-slice="1 1 []">This study examined seven School Safety Zones (ZoSS) in Banjar City, West Java, where traffic conditions and safety facilities vary across schools. It aimed to assess traffic conditions and facility compliance, rank schools needing safety improvements, and propose interventions with cost estimates. A quantitative approach was used, combining traffic surveys, vehicle speed measurements, inspections of 18 safety facility components, student enrollment data, and distances to accident-prone areas. Six indicators traffic volume, degree of saturation, vehicle speed, number of students, facility deficiencies, and distance to accident-prone areas were assessed using the Weighted Linear Combination (WLC) method. Traffic volumes ranged from 177 to 502 vehicles per hour, while vehicle speeds ranged from 37.5 to 43 km/h. None of the assessed safety facility components at SDN 3 Mulyasari and MI Rancakole met the requirements. Facility deficiencies reached 83.3% at SDN 1 Karangpanimbal and SDN 1 Sukamukti. Based on the reported WLC rankings, SDN 1 Karangpanimbal was the first priority (score 106), followed by SDN 7–9 Hegarsari (138) and SDN 1 Sukamukti (190). Proposed interventions include warning lights, traffic signs, road markings, and other supporting safety facilities. The estimated total cost for these three locations is IDR 469,047,563.33, potentially benefiting 607 students. The findings provide local authorities with an initial basis for selecting intervention sites, identifying needed facilities, and planning safety budgets. However, inconsistencies in facility deficiency data across tables and incomplete WLC weighting details must be resolved before the rankings guide final funding decisions. Because the proposed improvements have not yet been implemented, their effects on traffic speeds, pedestrian safety, and crashes remain untested. Future evaluations should assess actual conditions after installation to establish whether the interventions improve student safety. the study connects field assessments with practical planning while recognizing that stronger evidence and verified calculations are necessary for reliable implementation decisions.</p>2026-11-05T00:00:00+07:00Copyright (c) 2026 Veronica Simanjuntak, Siti Khodijah Koto, Dian Virda Sejati, Mega Suryandarihttps://jurnaljepip.com/index.php/jurit/article/view/399Changes in Soil Total Nitrogen and Available Phosphorus and Sweet Corn Growth and Yield Responses to Cattle Manure and Mycorrhizal Inoculation in Sandy Soil2026-10-06T15:03:58+07:00Dea Enjelideaenjeli013@gmail.comWahyu Astikodeaenjeli013@gmail.comHery Haryantodeaenjeli013@gmail.com<p><em>Sweet corn is an economically valuable crop, but its growth in sandy soil is often limited by poor water retention and low nutrient availability. This study aimed to compare soil total nitrogen and available phosphorus at 42 and 65 days after planting, describe changes in these nutrients, and examine their relationship with mycorrhizal development, plant growth, and yield. The experiment was conducted in Mataram from February to July 2025 using a randomized block design with five treatments and three replications. The treatments were an untreated control (P0), 10 metric tons per hectare of cattle manure (P1), 3 metric tons per hectare of mycorrhizae (P2), 5 metric tons per hectare of cattle manure combined with 1.5 metric tons per hectare of mycorrhizae (P3), and 10 metric tons per hectare of cattle manure combined with 3 metric tons per hectare of mycorrhizae (P4). Measurements included soil nutrients, plant height, leaf number, mycorrhizal spores, root colonization, and wet cob weight. P4 produced the highest soil total nitrogen content, reaching 0.153% at both observation times. Available phosphorus under P4 decreased from 92.30 ppm at 42 days to 46.34 ppm at 65 days, but remained higher than in the other treatments. P4 also produced plants 165.15 cm tall, root colonization of 96.66%, and wet cob weight of 7.40 kg per plot, an increase of 131.25% compared with the control. The number of mycorrhizal spores reached 5,014 per 100 g of soil under P4, compared with 1,961 in the control. Root colonization in the control indicated the presence of naturally occurring mycorrhizae. Overall, P4 performed best among the tested treatments, although its optimality remains unconfirmed. Further studies should test additional doses and compare costs to support practical nutrient management in sandy soils. The results offer useful evidence for designing practical fertilization strategies under sandy soil conditions</em></p>2026-11-05T00:00:00+07:00Copyright (c) 2026 Dea Enjeli, Wahyu Astiko, Hery Haryantohttps://jurnaljepip.com/index.php/jurit/article/view/400Analysis of Manual Router Operator Work Posture Using the REBA Method to Reduce the Risk of MSDs 2026-10-06T15:07:28+07:00Sulaeman Sulaemanmuhamadjahiri13021800057@gmail.comEka Lailita Eti Varinasulaeman8rahmat@mail.comResty Yulianasulaeman8rahmat@mail.com<p><em>Manual router operators at PT Delapan Intan Mutiara perform tasks that require bending, reaching, and controlling a handheld tool during routine production at this workstation, potentially exposing them to ergonomic risks. This study aimed to identify musculoskeletal complaint levels among operators, determine the body regions contributing most to complaint scores, and assess the risk of one documented working posture. A descriptive quantitative approach was applied to all 13 operators using the Nordic Body Map (NBM) questionnaire, which assessed 28 body regions. One recorded working posture was evaluated using Rapid Entire Body Assessment (REBA), supported by angle measurements from Kinovea software. The total NBM score was 835. The waist contributed the highest score, 41 (4.91%), followed by the back, 39 (4.67%). Both upper arms and both wrists each scored 33 (3.95%). Eight operators (61.5%) were classified as having moderate complaint levels, three (23.1%) high, one (7.7%) very high, and one (7.7%) low. The reported REBA score for the assessed posture was 13, indicating very high postural risk and a need for prompt ergonomic evaluation. However, the load, grip, and activity adjustments require confirmation from field measurements, so this score remains provisional. The findings suggest prioritizing adjustable workbench height, secure material clamps, and tool guides to reduce bending and excessive reaching. This study contributes a practical baseline combining operator-reported complaints with observation of a specific posture, helping the company set improvement priorities. The effectiveness of proposed changes must be tested through follow-up assessments before any reduction in ergonomic risk can be confirmed.</em></p>2026-11-06T00:00:00+07:00Copyright (c) 2026 Muhamad Jahiri, Eka Lailita Eti Varina, Resty Yulianahttps://jurnaljepip.com/index.php/jurit/article/view/429Effectiveness Analysis of a Multiwire Drawing Machine Using Overall Equipment Effectiveness and Failure Mode and Effect Analysis 2026-10-29T15:17:32+07:00Moh. Dwiky Maulana Rahmadanimdwikymr@gmail.comMoh. Jufriyantojufriyanto@umg.ac.id<p><em>The copper wire drawing process on the Multiwire Drawing (MWD) machine must run smoothly to ensure that automotive cable production is not disrupted. However, MWD Machine 8 experienced repeated shutdowns from April through June 2026. This study aims to evaluate the machine’s effectiveness, identify major disruptions, investigate possible causes of wire breaks, and determine maintenance priorities for components. The study employed a descriptive quantitative approach based on production reports, downtime records, observations, and interviews with operators, production leaders, and supervisors. The data were analyzed sequentially using Overall Equipment Effectiveness (OEE), the Six Big Losses, Fishbone diagrams, and Failure Mode and Effects Analysis (FMEA), supplemented by a sensitivity analysis of risk values. The results showed 243 stoppage incidents, including 168 wire break incidents (69.14%). Out of 1,586 hours of planned production time, downtime totaled 245.78 hours, resulting in a combined availability of 84.50%. The frequency of wire breaks decreased from 17.50 to 8.49 incidents per 100 hours of operation between April and June. However, the final OEE value could not yet be determined because the machine’s ideal technical speed had not been verified, and the provisional performance calculation for May reached 111.40%. The FMEA identified defective dies (RPN 288), clogged dryers (280), defective contact tubes (280), and defective capstans (210) as high priorities. Sensitivity analysis showed that the priority of the first three components remained high when a single score changed by one point. The study concluded that wire breaks were the most frequent disruptions, but their contribution to total downtime duration was unknown. Consequently, the company needs to prioritize component inspections, improve the recording of disruption durations, and verify production data. These results provide a basis for developing a more targeted and measurable maintenance schedule</em></p>2026-11-10T00:00:00+07:00Copyright (c) 2026 Moh. Dwiky Maulana Rahmadani, Moh. Jufriyantohttps://jurnaljepip.com/index.php/jurit/article/view/413Analysis of Service Quality Using a Combination of The Servqual Method and Importance-Performance Analysis at Event Organizer2026-10-07T23:09:04+07:00Defa Salma Annafisahdefasalma@gmail.comSaid Salim Dahdadefasalma@gmail.comDeny Andestadefasalma@gmail.com<p><em>Service quality is essential for event organizing companies because participants expect comfortable facilities, accurate information, timely services, and responsive staff. This study evaluates service quality at an anonymized event organizing company and identifies practical priorities for improvement. A quantitative survey was conducted with 104 event participants selected through purposive sampling. Twenty service attributes were assessed across five SERVQUAL dimensions by comparing perceived performance with participant expectations. Importance–Performance Analysis (IPA) was then used to classify attributes into four quadrants, while a Fishbone diagram was applied to explore potential causes of priority service problems. The results showed an average SERVQUAL gap of −0.25, indicating that perceived service performance remained below expectations. Reliability recorded the largest negative gap (−0.32), followed by responsiveness (−0.29), empathy (−0.28), tangibles (−0.26), and assurance (−0.07). IPA identified seven priority attributes: venue comfort, supporting facilities, service clarity, information accuracy, ease of contact, understanding participant needs, and convenient service timing. Fishbone analysis suggested that staffing constraints, unclear task assignments, inconsistent communication procedures, inadequate facilities, and weak post-event evaluation contributed to these shortcomings. The findings indicate that service improvements should focus first on high-priority attributes rather than treating all problems equally. Recommended actions include improving facilities, establishing clear communication procedures, defining staff responsibilities, providing accessible customer support, and collecting digital feedback after each event. This integrated assessment offers a practical basis for allocating resources and monitoring subsequent improvements, although the proposed actions require evaluation after implementation. Future evaluations should compare participant ratings and complaint patterns across successive events to assess progress.</em></p>2026-11-10T00:00:00+07:00Copyright (c) 2026 Defa Salma Annafisah, Said Salim Dahda, Deny Andestahttps://jurnaljepip.com/index.php/jurit/article/view/415Service Quality Assessment and Improvement Prioritization at the PT. Swabina Gatra Savings and Loan Cooperative Using SERVQUAL and IPA2026-10-09T18:57:18+07:00Miranda Gamarmirahbsy@gmail.comMuhammad Zainuddin Fathonizainuddin@umg.ac.id<p><em>This study aims to evaluate service quality and determine improvement priorities at the Savings and Loan Cooperative of PT Swabina Gatra by integrating Service Quality (SERVQUAL) and Importance Performance Analysis (IPA). Unlike previous studies that primarily confirm the existence of service gaps, the novelty of this research lies in its methodological contribution: creating a two-dimensional prioritization framework that combines gap magnitudes with IPA quadrant placements to classify attributes into immediate action, maintenance, or resource reallocation. A descriptive quantitative approach was employed, collecting data from 100 members (exceeding the minimum Slovin sample size of 86) through accidental sampling. The SERVQUAL analysis reveals an overall service quality score of 92.70% with an average gap of -0.30. The responsiveness dimension records the lowest quality (88.37%), while empathy shows the highest (98.32%). The IPA analysis identifies six attributes in Quadrant I (Top Priority), including TA1, TA2, TA3, RE2, RS1, and RS2. Among these, RS2 (staff promptness in responding to member inquiries and complaints) emerges as the most critical finding, exhibiting the largest SERVQUAL gap (-0.600). Practically, this finding directs management to implement specific corrective actions, such as a digital complaint tracking system and a 24-hour Service Level Agreement (SLA) for RS2, alongside targeted improvements for the other five attributes. It is important to note that this study is limited to a descriptive design; it identifies perceived service quality gaps and priorities but does not directly test whether these improvements will enhance member satisfaction or loyalty</em></p>2026-11-10T00:00:00+07:00Copyright (c) 2026 Miranda Gamar, Muhammad Zainuddin Fathonihttps://jurnaljepip.com/index.php/jurit/article/view/397Traffic Engineering Management of the Canggu Highway Area as Tourism Access in Canggu Regency2026-09-27T14:49:47+07:00I Putu Anom Wahyudi Putraanomputraa2@gmail.comYuanda Patria Tamaanomputraa2@gmail.comWisnu Wardana Kusumaanomputraa2@gmail.com<p><em>The Canggu Highway area is a major access route to the Canggu tourism destination in Badung Regency, Bali, where increasing tourism activities have intensified traffic movements and contributed to congestion, travel delays, and economic losses. This study aims to evaluate existing road network performance, develop traffic management and engineering strategies, estimate congestion costs, and assess potential performance improvements through simulation. The study covers nine road segments and three intersections in the Canggu Highway area. Traffic performance was analyzed using PTV Vissim microsimulation, with reference to the 2023 Indonesian Road Capacity Guidelines (PKJI), while congestion costs were estimated using the Tzedakis method, which considers travel time values and vehicle operating costs. Under existing weekday afternoon peak-hour conditions, the network exhibited an average delay of 134.18 seconds per vehicle and an average speed of 12.13 km/h. The proposed strategies comprise traffic signal coordination at the Kayu Tulang and Batu Bolong intersections, priority management at the Men Lari intersection, and improvements to pedestrian facilities. Simulation results indicate that these measures could reduce average delay to 99.37 seconds per vehicle and increase average network speed to 14.50 km/h. Estimated congestion costs could also decrease from IDR 3,965,472.11 per hour to IDR 2,636,383.25 per hour, representing a reduction of approximately 33.5%. These findings suggest that coordinated traffic control and improved pedestrian facilities have the potential to enhance modeled network performance and reduce congestion-related economic losses. The results can support local authorities in comparing and prioritizing traffic management interventions for the Canggu tourism area. However, field implementation and validation are required to confirm the effectiveness of the proposed strategies under actual traffic conditions. The findings also provide a basis for further evaluation of traffic management alternatives under different traffic demand conditions</em></p>2026-11-12T00:00:00+07:00Copyright (c) 2026 I Putu Anom Wahyudi Putra, Yuanda Patria Tama, Wisnu Wardana Kusuma