[1]
N. N. Khoiriyyah and Moh. Jufriyanto, “Analysis of Standard Times and Operator Requirements for the Sewing of IS 1200-900 Type FIBCs Using Time Study and Workload Analysis”, Jurnal Riset Ilmu Teknik, vol. 4, no. 3, pp. 351–361, Nov. 2026.